Reference
Reinforcing steel
1,100 tonnes of reinforcing steel were supplied.
Berlin – Marzahn
SÜLZLE Armierungstechnik is helping to redesign the Marzahn traffic junction in Berlin and improve mobility in the capital.
On behalf of STRABAG AG Hamburg, our team is laying around 1,100 tonnes of reinforcing steel for bridge construction from March 2023 to July 2025. The steel will be supplied by SÜLZLE Stahlpartner from Dessau-Roßlau.
The overall project includes the urgently needed replacement of the bridge structures in the Landsberger Allee/Märkische Allee area and over the railway tracks. The aim is to significantly improve transport links to the neighbouring areas, particularly to the industrial estates. All three bridge junctions are to be renewed by 2029.
FIND OUT MORE ABOUT THE PROJECT AT: https://www.berlin.de/sen/uvk/mobilitaet-und-verkehr/infrastruktur/brueckenbau/marzahner-knoten/
Products and services
Sülzle Stahlpartner GmbH
Branch Dessau-Roßlau
Lukoer Straße 50
06862 Dessau-Roßlau
Germany
Tel. +49 34901 507 – 0
Fax +49 34901 507 – 30
Mail dessau-rosslau@suelzle-stahlpartner.de
Thorsten Hille
Branch Manager
Tel. +49 3490 1507 – 16
Fax +49 3490 1507 – 20
Mail thorsten.hille@suelzle-stahlpartner.de